Preface to the third edition; Chapter 1 The Purpose and Use
of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The
use of IC; 1.4 Completing the form;Chapter 2 Contracts
Compared; Chapter 3 Contract Documents and Insurance; 3.1
Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and
priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to
use; 3.1.6 Notices ; 3.2 Insurance ; 3.2.1 Indemnity; 3.2.2 Injury
to persons and property; 3.2.3 Things which are the liability of
the employer; 3.2.4 Insurance of the Works: alternative clauses;
3.2.5 A new building where the contractor is required to insure;
3.2.6 A new building where the employer insures; 3.2.7 Alterations
or extensions to an existing building; 3.2.8 Benefits for
subcontractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3
Summary ; Chapter 4 The Architect's Authority and Duties;
4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The
issue of instructions: general; 4.1.4 Instructions in detail; 4.2
Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3
Summary ; Chapter 5 The Contractor's Obligations; 5.1
Express and implied obligations; 5.1.1 Legal principles; 5.1.2
Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4
Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and
setting out; 5.2 Other obligations; 5.2.1 Access to the Works and
premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance
with architect's instructions; 5.2.4 Suspension of performance;
5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6
The Employer's Powers, Duties and Rights; 6.1 Express and implied
powers and duties; 6.1.1 Co-operation or non-interference; 6.2
Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site;
6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment
of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties;
6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties;
6.4 Summary; Chapter 7 The Clerk of Works; 7.1 Appointment;
7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8
Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors;
8.2.1 Assignment and subcontracting; 8.2.2 Named persons as
subcontractors; 8.3 Statutory authorities; 8.4 Work not forming
part of the contract; 8.5 Third part rights and collateral
warranties; 8.6 Summary; Chapter 9 Possession, Practical
Completion and Defects Liability; 9.1 Possession; 9.1.1 General;
9.1.2 Date for possession; 9.2 Practical completion; 9.2.1
Definition; 9.2.2 Consequences ; 9.2.3 Partial possession and
sectional completion; 9.3 Rectification period; 9.3.1 Definition;
9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4
Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General;
10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated
damages; 10.2.3 Procedure; 10.2.4 Grounds; 10.3 Loss and expense
claims; 10.3.1 Definition; 10.3.2 Procedure; 10.3.3 Matters
grounding a claim; 10.4 Summary; Chapter 11 Payment; 11.1
The contract sum; 11.2 Payment before practical completion; 11.2.1
Method and timing; 11.2.2 Valuation; 11.2.3 Amounts included; 11.3
Payment at practical completion; 11.4 Retention; 11.5 Final
payment; 11.6 The effect of certificates; 11.7 Withholding payment;
11.8 Variations; 11.9 Valuation of contractor’s designed
portion; 11.10 Fluctuations; 11.11 Summary ; Chapter 12
Termination; 12.1 Termination by the employer; 12.1.1 General;
12.1.2 Grounds (clause 8.4.1): contractor's defaults; 12.1.3
Grounds (clause 8.5): insolvency of contractor; 12.1.4 Grounds
(clause 8.6): corruption; 12.1.5 Grounds (clause 8.11): neutral
causes; 12.1.6 Grounds (paragraph C.4.4 of schedule 1 and clause
6.10.2.2): insurance risks and terrorism cover;12.1.7 Consequences
(clauses 8.5.3, 8.7 and 8.8); 12.1.8 Consequences (clauses 8.11 and
paragraph C.4.4 of schedule 1); 12.2 Termination by the contractor;
12.2.1 General; 12.2.2 Grounds (clause 8.9): employer's faults;
12.2.3 Grounds (clause 8.10): insolvency; 12.2.4 Grounds (clause
8.11): neutral causes; 12.2.5 Grounds (paragraph C.4.4 of schedule
1 and clause 6.10.2.2): insurance risks and terrorism cover; 12.2.6
Consequences (clause 8.12); 12.2.7 Consequences (paragraph C.4.4 of
schedule 1 and clause 6.10.2.2); 12.3 Summary; Chapter 13
Contractor’s designed portion (CDP); 13.1 General; 13.2
Documents; 13.3 The contractor’s obligations; 13.4 Liability;
13.5 Variations; 13.6 Insurance; 13.7 Summary; Chapter 14
Dispute Resolution Procedures; 14.1 General; 14.2 Adjudication;
14.2.1 The contract provisions; 14.2.2 The Scheme: notice of
adjudication; 14.2.3 The Scheme: appointment of the adjudicator;
14.2.4 The Scheme: procedure; 14.2.5 The Scheme:
adjudicator’s powers and duties; 14.2.6 The Scheme: the
adjudicator’s decision; 14.2.7 The Scheme: costs; 14.3
Arbitration; 14.3.1 General ; 14.3.2 Procedure; 14.3.3 The
appointment of an arbitrator; 14.3.4 Counterclaims; 14.3.5 Powers
of the arbitrator; 14.3.6 Third party procedure; 14.4 Legal
proceedings; 14.5 Summary;.
Appendix A Intermediate Named Sub-Contractor Tender and Agreement (ICSub/NAM/IT), (ICSub/NAM/T), (ICSub/NAM/A); Appendix B Intermediate Named Sub-Contract Conditions (ICSub/NAM/C);Appendix C Intermediate Named Sub-Contractor/Employer Agreement; (ICSub/NAM/E); Table of Cases; Clause Number Index to Text; Subject Index.