Wiley.com
Print this page Share

Value Engineering: Practical Applications...for Design, Construction, Maintenance and Operations

ISBN: 978-0-87629-463-5
Paperback
464 pages
September 1997
List Price: US $98.75
Government Price: US $68.44
Enter Quantity:   Buy
Value Engineering: Practical Applications...for Design, Construction, Maintenance and Operations (0876294638) cover image

List of Figures.

Preface and Acknowledgements.

About the Author.

Introduction: A Briefing.

The Objectives of Value Engineering.

The Reasons for Unnecessary Costs.

When to Apply Value Engineering.

VE Methodology and Techniques.

InterfaceWith Other Programs.

Demonstrated Impact of VE.

Part One: Value Engineering: Practical Applications.

Chapter One: Project Scope and Budget.

Elements of the Project Budget.

Prevalent Budgeting Techniques.

Cost Control.

Defining Project Scope.

Parameters and Parameter Cost.

Chapter Two: The Capitalized Income Approach to Project Budgeting (CIAPB).

CIAPB Objectives.

Measuring Property Value.

The Meaning of Capitalization.

The Capitalization Process.

The Need for Cost Control.

Chapter Three: Preparation of Cost Models.

Making Models.

Construction Cost Models.

Other Resources.

Types of Models.

Chapter Four: Planning for Value Engineering Services.

VE Objectives.

Level of Effort.

VE and Total Project Management.

Team Selection.

The VE Job Plan.

Chapter Five: Function Analysis.

Classifying Function.

Defining Functions.

Project Level Function Analysis System Techniques (FAST) Diagram.

Chapter Six: Creativity and Interpersonal Skills.

Creativity and Fixation.

Interpersonal Skills.

Human Factors.

Creativity Throughout the Job Plan.

The Generation of Ideas.

Delphi Technique.

Value Engineering—A Crafted Strategy.

Chapter Seven: Life Cycle Costing.

Decision Makers' Impact on LCC.

LCC and Total Building Costs.

LCC Terminology and Examples.

LCC Methodology.

Application of LCC to Buildings.

Chapter Eight: Integrating VE into the Construction Industry.

Planning and Design.

Construction.

Maintenance and Operations (M&O).

Chapter Nine: VE Applications to Risk Assessment and Analysis.

Risk Assessment.

Risk Analysis.

Part Two: Case Studies.

Case Study One: Corporate Office Building.

Case Study Two: Hospital and Staff Housing Complex.

Case Study Three: Refinery Facility.

Case Study Four: Master Planning Competition.

Case Study Five: Application to Design Review Government Headquarters/Complex.

Case Study Six: Highway Project: South Interchange.

Case Study Seven: Wastewater Treatment Plant.

Part Three: VEWorkbook.

Introduction.

List of Forms.

Phase 1: Information Phase.

Phase 2: Function Phase.

Phase 3: Creative Phase.

Idea Stimulator Checklist.

Phase 4: Analysis/Judicial Phase.

Analysis/Judicial Phase: Analysis/Development.

Analysis/Judicial Phase: Analysis/Evaluation.

Phase 5: Recommendation.

Phase 6: Presentation & Implementation.

Appendix.

Web Site Resources.

Value Engineering Services for CM/PM: Typical Scope ofWork.

Glossary of Terms.

Index.

Part Four: Diskette.

Life Cycle Cost Program with Linked Database.

VEWorkbook Forms with Supporting Linkages.

Back to Top