1.1. Objective / Scope.
1.2. Organization of This Book.
1.3. Introduction to Terminology.
1.4. The Contract Opportunity.
1.5. References.
Chapter 2. Contractor Safety Programs: General.
2.1. Introduction.
2.2. Safe Work Practices.
2.3. Contractor Qualification.
2.4. Documentation.
2.5. References.
Chapter 3. OSHA PSMA and The EPC Contractor.
3.1. Project Planning under OSHA PSM.
3.2. PSM Elements.
3.3. Checklists Basis for PSM Project Plan.
3.4. References.
Chapter 4. Subcontractor Relationships.
4.1. Introduction.
4.2. Seamless Interfaces.
4.3. Shared Liabilities.
4.4. Direct Contract Employees.
4.5. References.
Chapter 5. Managing Client-Contractor Risk.
5.1. Introduction.
5.2. Indemnification.
5.3. Consequential Damages.
5.4. Differing Conditions.
5.5. Delays.
5.6. Attorneys-Client Privilege.
5.7. Trust.
5.8. References.
Appendix A. Contractor Checklists.
Appendix B. Standardized Prequalification Form (PQF).