Audel Installation Requirements of the 2005 National Electrical Code, All New EditionISBN: 978-0-7645-7899-1
Paperback
287 pages
January 2005
This is a Print-on-Demand title. It will be printed specifically to fill your order. Please allow an additional 10-15 days delivery time. The book is not returnable.
|
Chapter 1: General Requirements.
Chapter 2: Branch Circuits.
Chapter 3: Feeders.
Chapter 4: Services.
Chapter 5: Overcurrent Protection.
Chapter 6: Grounding.
Chapter 7: Wiring Requirements.
Chapter 8: Wiring in Cable.
Chapter 9: Wiring in Conduit.
Chapter 10: Raceways and Wireways.
Chapter 11: Busways.
Chapter 12: Outlet and Pull Boxes.
Chapter 13: Switches and Switchboards.
Chapter 14: Cords.
Chapter 15: Lighting Fixtures.
Chapter 16: Receptacles.
Chapter 17: Appliances.
Chapter 18: Motors and Controllers.
Chapter 19: HVAC Equipment.
Chapter 20: Generators.
Chapter 21: Transformers.
Chapter 22: Capacitors, Resistors, and Batteries.
Chapter 23: Hazardous Locations.
Chapter 24: Service Stations.
Chapter 25: Bulk Storage Plants.
Chapter 26: Spray Areas.
Chapter 27: Health Care Facilities.
Chapter 28: Places of Assembly, Theaters, Motion Picture and Television Studios.
Chapter 29: Signs.
Chapter 30: Manufactured Wiring Systems.
Chapter 31: Mobile Homes and RV Parks.
Chapter 32: Data Processing Areas.
Chapter 33: Swimming Pools.
Chapter 34: Solar Electric Systems.
Chapter 35: Emergency Systems.
Chapter 36: High Voltage.
Chapter 37: Low Voltage.
Chapter 38: Fiber-Optic Cables.
Chapter 39: Communications.
Chapter 40: Special Installations.
Glossary.
Index.