Audel Managing Shutdowns, Turnarounds, and OutagesISBN: 978-0-7645-5766-8
Paperback
240 pages
September 2004
|
Introduction.
Chapter 1: Identifying the Work.
Identifying the Work.
Risk Management.
Defining and Limiting the Scope.
Summary.
Chapter 2: Planning the Work.
Planning the Shutdown.
Planning Thought Process.
Estimating Tips.
Work Packages.
Contracts for Services.
Summary.
Chapter 3: Scheduling the Work.
Critical Path Method (CPM).
Program Evaluation and Review-Technique (PERT).
The Monte Carlo Method.
Project Management Software.
Summary.
Chapter 4: Executing the Project.
Shutdown Safety.
OSHA Requirements.
Developing Daily Schedules.
Updating Job Status.
Reporting Project Status.
Tracking Project Costs.
Summary.
Chapter 5: Reporting and Documenting the Shutdown Activity.
Project Review Meeting.
Project File.
Final Report.
Sample Shutdown Report.
Summary.
Appendix A: Boiler Shutdown Example.
Boiler History.
The Shutdown.
Identifying the Work.
Building the Work List.
Appendix B: Identifying Electrical Work to Be Performed During a Shutdown.
Electrical Shutdown Checklist.
Appendix C: Machinery Inspection Prior to and During a Shutdown.
Bearing Data.
Shaft Alignment Standards.
Gear Drive Inspection Standards.
V-Belt Drives.
Pumps and Mechanical Seals.
Fans.