Wiley.com
Print this page Share

Defective Construction Work: and the Project Team

ISBN: 978-0-632-05929-4
Hardcover
224 pages
August 2008, Wiley-Blackwell
List Price: US $156.00
Government Price: US $107.48
Enter Quantity:   Buy
Defective Construction Work: and the Project Team (063205929X) cover image

Preface.

Glossary.

1 Definition and categorization.

1.1 Definition of “defect”.

1.2 Qualitative defects.

1.3 Patent/latent defects.

1.4 Reasonable examination.

1.5 Importance of distinction between patent/latent defects.

1.6 The purchaser and the project team.

2 Common law, statutory and contractual rights.

2.1 Common law.

2.2 Statute.

2.3 Contractual rights.

3 Contracts – an overview.

3.1 Function.

3.2 The basics.

3.2.1 Simple contracts.

3.2.2 Deeds.

3.2.3 Distinction between simple contracts and deeds.

3.3 Express terms.

3.4 Implied terms.

3.4.1 Common law terms.

3.4.2 Supply of Goods and Services Act 1982.

3.4.3 Housing Grants, Construction and Regeneration Act 1996.

3.5 Exclusion of Implied Terms.

3.6 Exclusion clauses.

3.7 Risk allocation.

3.8 Model conditions.

4 No Contact/Restitution.

4.1 Restitution.

4.2 Restitution and defects.

4.2.1 The standard of work.

4.2.2 The ‘usual standards’.

4.2.3 Fitness for purpose.

4.2.4 The Defective Premises Act 1972.

4.2.5 Failure to complete.

4.2.6 Cross-claims.

4.2.7 Latent defects.

5 Letters of Intent.

5.1 Function.

5.2 Legal analysis.

5.3 Implications where defects occur.

6 Tort – an overview.

6.1 Negligence.

6.1.1 Persons and property.

6.1.2 Pure economic loss.

6.2 Complex structures.

6.2.1 A theory?.

6.2.2 An exception?.

6.2.3 A test?.

6.3 Economic harm.

6.3.1 A concurrent duty.

6.3.2 Third parties.

6.3.3 The tests.

6.3.3.1 Assumption of responsibility.

6.3.3.2 Proximity, foreseeability and fairness.

6.3.3.3 Incrementalism.

6.3.3.4 Which test?.

6.4 Builders and professional consultants.

6.4.1 Builders.

6.4.2 Professional consultants.

6.4.3 Liability to third parties.

6.4.4 Conclusion.

7 The Defective Premises Act 1972.

7.1 Application.

7.2 Fitness for habitation.

7.3 Exclusion.

8 Third Party Rights.

8.1 The exception.

8.2 Agency.

8.3 Assignment.

8.4 Novation.

8.5 Statutory third party rights.

8.6 Collateral contracts.

8.7 Tort.

9 Statutory requirements.

9.1 The Building Act 1984.

9.2 Building regulations.

9.3 Construction products.

9.4 Workplace safety regulations.

9.5 CDM regulations.

9.6 Relationship with contractual obligations.

10 The builder’s obligations - design, workmanship and materials.

10.1 Buildability, durability and maintenance.

10.2 Workmanship.

10.2.1 Care & skill.

10.2.2 Specified standards.

10.2.3 Inspection of materials.

10.2.4 Duty to warn.

10.2.4.1 An implied duty.

10.2.4.2 An aspect of care and skill.

10.3 Materials.

10.3.1 Description.

10.3.2 Satisfactory quality – history.

10.3.3 Satisfactory quality – scope.

10.3.4 Satisfactory quality – relevance of selection.

10.3.5 Fitness for purpose.

10.4 Design.

11 The builder’s obligations - defects before completion.

11.1 Temporary disconformities.

11.1.1 The theory.

11.1.2 The theory confined.

11.1.3 Reconciling the cases.

11.2 Opening up the work.

11.3 Defects and interim payment.

11.3.1 The contractual position.

11.3.2 Interim valuations, certificates and payments.

11.3.3 The effect of the HGCRA.

12 The builder’s obligations - defects at completion.

12.1 Scope of work to be completed.

12.1.1 Indispensably necessary work.

12.1.2 Contingently necessary work.

12.2 Completion.

12.2.1 The common law concept.

12.2.2 Substantial completion.

12.2.3 Practical completion.

12.3 Snagging.

12.4 The effect of practical completion.

12.5 The ICE, NEC3 and MF/1 conditions.

12.6 The JCT Major Project Construction Contract.

12.7 The provision of information prior to practical completion.

13 Defective works post completion.

13.1 The common law.

13.2 Defects liability period.

13.2.1 Duration.

13.2.2 Snagging.

13.2.3 ‘Defects arising’.

13.2.4 Compensation instead of repair.

13.2.5 Instructions.

13.2.6 Making good.

13.3 Retention money.

13.4 Retention bonds.

13.5 Final certificates.

13.5.1 The JCT SBC conditions.

13.5.1.1 Qualifications to the conclusivity rule.

13.5.1.2 The class of defects affected.

13.5.2 The ICE conditions.

13.5.3 The MF/1 conditions.

14 The Professional Team.

14.1 Membership of a professional body.

14.2 The structure of the team.

14.3 Duties.

14.3.1 Reasonable care and skill.

14.3.2 Fitness for purpose.

14.3.3 Concurrent duty of care.

14.4 Buildability, durability and maintenance – the designer’s obligations.

15 Architects/Engineers.

15.1 Design.

15.2 Selecting builders and other specialists.

15.3 Supervision.

15.4 Periodic Inspection.

15.5 Certification.

15.6 Design review.

15.6.1 Stage one: up to implementation.

15.6.2 Stage two: implementation to practical completion.

15.6.3 Stage three: after practical completion.

15.7 Defects investigations.

15.8 Honest reporting.

15.9 Termination of performance.

16 Surveyors, Project Managers & others.

16.1 Project managers.

16.2 Quantity surveyors.

16.3 CDM Co-ordinators.

16.4 Clerk of works/engineer’s representatives.

17 Compensation.

17.1 Abatement.

17.2 Compensation.

17.2.1 Cost of reinstatement.

17.2.2 Diminution in value.

17.2.3 Reinstatement and diminution.

17.2.4 Date of assessment.

17.3 Betterment.

17.4 Mitigation.

17.5 Parasitic losses.

17.6 Distress and inconvenience.

17.7 Contribution.

17.8 Contributory negligence.

18 Remedies/damages/limitation.

18.1 Breach of condition.

18.2 Repudiation.

18.3 Express termination provisions.

19 Limitation.

19.1 Contract.

19.2 Tort.

19.2.1 The primary limitation period.

19.2.1.1 Physical damage.

19.2.1.2 Economic damage.

19.2.1.3 Reconcilliation of the cases.

19.2.2 The secondary limitation period.

19.3 Contractual limitation provisions.

19.4 Limitation and contribution proceedings.

20 Dispute resolution.

20.1 Litigation.

20.2 Arbitration.

20.3 Adjudication.

20.4 Expert Determination.

20.5 Alternative Dispute Resolution.

Table of casesIndex

Back to Top