Wiley.com
Print this page Share

Maintaining Mission Critical Systems in a 24/7 Environment

ISBN: 978-0-471-68374-2
Hardcover
512 pages
March 2007, Wiley-IEEE Press
Maintaining Mission Critical Systems in a 24/7 Environment (0471683744) cover image
This title is out-of-print and not currently available for purchase from this site.

Foreword.

Preface.

Acknowledgments.

1. An Overview of Reliability and Resilience in Today’s Mission Critical Facilities.

1.1 Introduction.

1.2 Risk Assessment.

1.3 Capital Costs Versus Operation Costs.

1.4 Change Management.

1.5 Testing and Commissioning.

1.6 Documentation and Human Factor.

1.7 Education and Training.

1.8 Operation and Maintenance.

1.9 Employee Certification.

1.10 Standard and Benchmarking.

2. Policies and Regulations.

2.1 Executive Summary.

2.2 Introduction.

2.3 Industry Regulations and Policies.

2.3.1 U.S. Patriot Act.

2.3.2 The National Strategy for the Physical Protection of Critical Infrastructures and Key Assets.

2.3.3 U.S. Security and Exchange Commission (SEC).

2.3.4 Sound Practices to Strengthen the Resilience of the U.S. Financial System.

2.3.5 Federal Real Property Council (FRPC).

2.3.6 Basel II Accord.

2.3.7 Sarbanes–Oxley (SOX).

2.3.8 NFPA 1600.

3. Mission Critical Facilities Engineering.

3.1 Introduction.

3.2 Companies’ Expectations: Risk Tolerance and Reliability.

3.3 Identifying the Appropriate Redundancy in a Mission Critical Facility.

3.4 Improving Reliability, Maintainability, and Proactive Preventative Maintenance.

3.5 The Mission Critical Facilities Manager and the Importance of the Boardroom.

3.6 Quantifying Reliability and Availability.

3.6.1 Review of Reliability Versus Availability.

3.7 Design Considerations for the Mission Critical Data Center.

3.8 Mission Critical Facility Start-Up.

3.9 The Evolution of Mission Critical Facility Design.

4. Mission Critical Electrical Systems Maintenance.

4.1 Introduction.

4.2 The History of the Maintenance Supervisor and the Evolution of the Mission Critical Facilities Engineer.

4.3 Internal Building Deficiencies and Analysis.

4.4 Evaluating Your System.

4.5 Choosing a Maintenance Approach.

4.6 Standards and Regulations Affecting How Safe Electrical Maintenance Is Performed.

4.7 Maintenance of Typical Electrical Distribution Equipment.

4.7.1 Infrared Scanning.

4.7.2 15-Kilovolt Class Equipment.

4.7.3 480-Volt Switchgear.

4.7.4 Motor Control Centers and Panel Boards.

4.7.5 Automatic Transfer Switches.

4.7.6 Automatic Static Transfer Switches (ASTS).

4.7.7 Power Distribution Units.

4.7.8 277/480-Volt Transformers.

4.7.9 Uninterruptible Power Systems.

4.7.10 A Final Point on Servicing Equipment.

4.8 Being Proactive in Evaluating the Test Reports.

4.9 Data Center Reliability.

5. Standby Generators: Technology, Applications, and Maintenance.

5.1 Introduction.

5.2 The Necessity for Standby Power.

5.3 Emergency, Legally Required, and Optional Systems.

5.4 Standby Systems that Are Legally Required.

5.5 Optional Standby Systems.

5.6 Understanding Your Power Requirements.

5.7 Management Commitment and Training.

5.7.1 Lockout/Tagout.

5.7.2 Training.

5.8 Standby Generator Systems Maintenance Procedures.

5.8.1 Maintenance Record Keeping and Data Trending.

5.8.2 Load Bank Testing.

5.9 Documentation Plan.

5.9.1 Proper Documentation and Forms.

5.9.2 Record Keeping.

5.10 Emergency Procedures.

5.11 Cold Start and Load Acceptance.

5.12 Nonlinear Load Problems.

5.13 Conclusions.

6. Fuel Systems and Design and Maintenance for Fuel Oil (Howard L. Chesneau, Edward English III, and Ron Ritorto).

6.1 Fuel Systems and Fuel Oil.

6.1.1 Fuel Supply Maintenance Items.

6.1.2 Fuel Supply Typical Design Criteria.

6.2 Bulk Storage Tank Selection.

6.3 Codes and Standards.

6.4 Recommended Practices for all Tanks.

6.5 Fuel Distribution System Configuration.

6.5.1 Day Tank Control System.

7. Automatic Transfer Switch Technology, Application, and Maintenance.

7.1 Introduction.

7.2 Overview.

7.3 Transfer Switch Technology and Applications.

7.3.1 Types of Transfer Switches.

7.3.2 Bypass-Isolation Transfer Switches.

7.3.3 Breaker Pair ATSs.

7.4 Control Devices.

7.4.1 Time Delays.

7.4.2 In-Phase Monitor.

7.4.3 Programmed (Delayed) Transition.

7.4.4 Closed Transition Transfer (Parallel Transfer).

7.4.5 Test Switches.

7.4.6 Exercise Clock.

7.4.7 Voltage and Frequency Sensing Controls.

7.5 Optional Accessories and Features.

7.6 ATS Required Capabilities.

7.6.1 Close Against High In-Rush Currents.

7.6.2 Withstand and Closing Rating (WCR).

7.6.3 Carry Full Rated Current Continuously.

7.6.4 Interrupt Current.

7.7 Additional Characteristics and Ratings of ATSs.

7.7.1 NEMA Classification.

7.7.2 System Voltage Ratings.

7.7.3 ATS Sizing.

7.7.4 Seismic Requirement.

7.8 Installation, Maintenance, and Safety.

7.8.1 Installation Procedures.

7.8.2 Maintenance Safety.

7.8.3 Maintenance.

7.8.4 Drawings and Manuals.

7.8.5 Testing and training.

7.9 General Recommendations.

8. The Static Transfer Switch.

8.1 Introduction.

8.2 Overview.

8.2.1 Major Components.

8.3 Typical Static Switch One Line.

8.3.1 Normal Operation.

8.3.2 STS and STS/Transformer Configurations.

8.4 STS Technology and Application.

8.4.1 General Parameters.

8.4.2 STS Location and Type.

8.4.3 Advantages and Disadvantages of the Primary and Secondary STS/Transformer Systems.

8.4.4 Monitoring and Data Logging and Data Management.

8.4.5 STS Remote Communication.

8.4.6 Security.

8.4.7 Human Engineering and Eliminating Human Errors.

8.4.8 Reliability and Availability.

8.4.9 Reparability and Maintainability.

8.4.10 Fault Tolerance and Abnormal Operation.

8.5 Testing.

8.6 Conclusion.

9. The Fundamentals of Power Quality and their Associated Problems.

9.1 Introduction.

9.2 Electricity Basics.

9.2.1 Basic Circuit.

9.3 Transmission of Power.

9.3.1 Life Cycle of Electricity.

9.3.2 Single- and Three-Phase Power Basics.

9.3.3 Unreliable Power Versus Reliable Power.

9.4 Understanding Power Problems.

9.4.1 Power Quality Transients.

9.4.2 RMS Variations.

9.4.3 Causes of Power Line Disturbances.

9.4.4 Power Line Disturbance Levels.

9.5 Tolerances of Computer Equipment.

9.5.1 CBEMA Curve.

9.5.2 ITIC Curve.

9.5.3 Purpose of Curves.

9.6 Power Monitoring.

9.6.1 Example Power Monitoring Equipment.

9.7 The Deregulation Wildcard.

9.8 Troubleshooting Power Quality.

10. An Overview of UPS Systems: Technology, Application, and Maintenance.

10.1 Introduction.

10.2 Purpose of UPS Systems.

10.3 General Description of UPS Systems.

10.3.1 What Is a UPS System?

10.3.2 How Does a UPS System Work?

10.4 Static UPS Systems.

10.4.1 Online.

10.4.2 Double Conversion.

10.4.3 UPS Power Path.

10.5 Components of a Static UPS System.

10.5.1 Power Control Devices.

10.5.2 Line Interactive UPS Systems.

10.6 Rotary Systems.

10.6.1 Rotary UPS Systems.

10.6.2 UPSs Using Diesel.

10.7 Redundancy and Configurations.

10.7.1 Redundancy.

10.7.2 Isolated Redundant.

10.7.3 Tie Systems.

10.8 Batteries and Energy Storage Systems.

10.8.1 Battery.

10.8.2 Flywheel Energy.

10.9 UPS Maintenance and Testing.

10.9.1 Steady-State Load Test.

10.9.2 Harmonic Analysis.

10.9.3 Filter Integrity.

10.9.4 Transient Response Load Test.

10.9.5 Module Fault Test.

10.9.6 Battery Run Down Test.

10.10 Static UPS and Maintenance.

10.10.1 Semi-Annual Checks and Services.

10.11 UPS Management.

10.12 Additional Topics.

10.12.1 Offline (Standby).

11. Data Center Cooling: Systems and Components (Don Beaty).

11.1 Introduction.

11.2 Building Cooling Overview.

11.3 Cooling Within Datacom Rooms.

11.4 Cooling Systems.

11.4.1 Airside.

11.4.2 Waterside.

11.4.3 Air- and Liquid-Cooling Distribution Systems.

11.5 Components Outside the Datacom Room.

11.5.1 Refrigeration Equipment—Chillers.

11.5.2 Heat Rejection Equipment.

11.5.3 Energy Recovery Equipment.

11.6 Components Inside Datacom Room.

11.6.1 CRAC Units.

12. Raised Access Floors (Dan Catalfu).

12.1 Introduction.

12.1.1 What Is an Access Floor?

12.1.2 What Are the Typical Applications for Access Floors?

12.1.3 Why Use an Access Floor?

12.2 Design Considerations.

12.2.1 Determine the Structural Performance Required.

12.2.2 Determine the Required Finished Floor Height.

12.2.3 Determine the Understructure Support Design Type Required.

12.2.4 Determine the Appropriate Floor Finish.

12.2.5 Airflow Requirements.

12.3 Safety Concerns.

12.3.1 Removal and Reinstallation of Panels.

12.3.2 Removing Panels.

12.3.3 Reinstalling Panels.

12.3.4 Stringer Systems.

12.3.5 Protecting the Floor from Heavy Loads.

12.3.6 Grounding the Access Floor.

12.3.7 Fire Protection.

12.3.8 Zinc Whiskers.

12.4 Panel Cutting.

12.4.1 Safety Requirements for Cutting Panels.

12.4.2 Guidelines for Cutting Panels.

12.4.3 Cutout Locations in Panels; Supplemental Support for Cut Panels.

12.4.4 Saws and Blades for Panel Cutting.

12.4.5 Interior Cutout Procedure.

12.4.6 Round Cutout Procedure.

12.4.7 Installing Protective Trim Around Cut Edges.

12.5 Access Floor Maintenance.

12.5.1 Standard High-Pressure Laminate Floor Tile (HPL).

12.5.2 Vinyl Conductive and Static Dissipative Tile.

12.5.3 Cleaning the Floor Cavity.

12.5.4 Removing Liquid from the Floor Cavity.

12.6 Troubleshooting.

12.6.1 Making Pedestal Height Adjustments.

12.6.2 Rocking Panel Condition.

12.6.3 Panel Lipping Condition (Panel Sitting High).

12.6.4 Out-of-Square Stringer Grid (Twisted Grid).

12.6.5 Tipping at Perimeter Panels.

12.6.6 Tight Floor or Loose Floor: Floor Systems Laminated with HPL Tile.

13. Fire Protection in Mission Critical Infrastructures (Brian K. Fabel).

13.1 Introduction.

13.2 Philosophy.

13.2.1 Alarm and Notification.

13.2.2 Early Detection.

13.2.3 Fire Suppression.

13.3 Systems Design.

13.3.1 System Types.

13.3.2 Fire and Building Codes.

13.4 Fire Detection.

13.5 Fire Suppression Systems.

13.5.1 Watermist Systems.

13.5.2 Carbon Dioxide Systems.

13.5.3 Clean Agent Systems.

13.5.4 Inert Gas Agents.

13.5.5 IG-541.

13.5.6 IG-55.

13.5.7 Chemical Clean Agents.

13.5.8 Fire Extinguishers.

Bibliography.

Appendix A: Critical Power.

Appendix B: BITS Guide to Business-Critical Power.

Appendix C: Syska Criticality Levels.

Glossary.

Index.

Related Titles

More From This Series

by Gonzalo Abad, Jesus Lopez, Miguel Rodriguez, Luis Marroyo, Grzegorz Iwanski

Risk, Contingency & Crisis Management

by CME Group, John W. Labuszewski, John E. Nyhoff, Richard Co, Paul E. Peterson, Leo Melamed (Foreword by)
Back to Top